Automation and Industry 5.0
PLC, SCADA, robotics, industrial networks, OT cybersecurity.
01 The problem
You have twenty machines from seven different brands and none of them talk to each other. Or your SCADA runs on a PC from 2011 that nobody dares to switch off.
02 What we do
- Plant supervision: a single system above machines from different vendors.
- Retrofit of existing plants, without stopping production longer than necessary.
- Field commissioning, in Italy and abroad.
- OT cybersecurity and NIS2, which stops being optional on 1 October 2026.
Proof
Over twenty machines under a single supervision system, continuous monitoring, energy consumption down 30%. Published in Automazione Oggi.
Thirty minutes, and at the end you know what to do.
You tell me the problem, I tell you whether I can solve it, what it costs and how long it takes. Free. It's not a sales call: it's the first hour of work.
Got a problem worth solving?
Write me what you need to build, even in two lines. I answer personally, usually within one working day.
Tell me about your project